OEE Measurement with Work Sampling

Equipment efficiency diagnosis without investment in costly sensors

Why Sampling for OEE?

OEE (Overall Equipment Effectiveness) is traditionally measured with sensors and SCADA systems. However, work sampling is an affordable and fast alternative for:

  • Plants without automated measurement infrastructure
  • Initial diagnosis before investing in systems
  • Validate/audit data from existing systems
  • Identify the causes of low efficiency (not just the number)

The 3 Factors of OEE

โฑ๏ธ

Availability

% of time the machine is available to produce

Typical target: >90%

๐Ÿš€

Performance

% of real speed vs nominal speed

Typical target: >95%

โœ…

Quality

% of good parts vs total produced

Typical target: >99%

OEE Formula

OEE = Availability ร— Performance ร— Quality

Example: 85% ร— 90% ร— 98% = 75% OEE (World Class >85%)

What Sampling Can Measure

Work sampling is especially useful for measuring Availability and the causes of loss:

Observed State Category OEE Impact
Producing Productive โœ… Available
Changeover Planned delay Availability loss
Breakdown Unplanned delay Availability loss
Waiting for operator Management delay Availability loss
Micro-stop Frequent delay Performance loss
Missing material Logistics delay Availability loss

Case Study: Capacity Diagnosis

๐Ÿ“‹ Scenario

A plastic injection plant considers buying a new machine ($50,000) because it "can't keep up" with current demand.

Study performed:

  • โ€ข 2 weeks of sampling
  • โ€ข 400 observations
  • โ€ข 95% confidence level

Sampling Results

Producing 55%
Waiting for Operator 30%
Changeover 8%
Breakdown 4%
Other 3%

Analysis

The 30% "Waiting for Operator" was the key revelation:

  • The machine finishes its cycle but the operator is attending another machine
  • A single operator handles 3 injection machines
  • It is not a lack of machine capacity, it is a lack of staff

โŒ Without the study

Buy new machine

Cost: $50,000 CAPEX

+ The problem would persist (still missing an operator)

โœ… With the study

Hire an auxiliary operator

Cost: $15,000/year OPEX

+ Increases utilisation of the 3 existing machines

How to Configure the Study

In our app, create a study with these categories:

๐Ÿ“‚ PRODUCTIVE

โ”œโ”€โ”€ Producing (normal cycle)

โ””โ”€โ”€ Producing (slow cycle)

๐Ÿ“‚ PLANNED DELAY

โ”œโ”€โ”€ Changeover/mould change

โ”œโ”€โ”€ Preventive maintenance

โ””โ”€โ”€ Scheduled cleaning

๐Ÿ“‚ UNPLANNED DELAY

โ”œโ”€โ”€ Mechanical breakdown

โ”œโ”€โ”€ Electrical breakdown

โ”œโ”€โ”€ Waiting for operator

โ”œโ”€โ”€ Waiting for material

โ”œโ”€โ”€ Waiting for quality

โ””โ”€โ”€ Micro-stop (jam, adjustment)

Study ROI

A 2-week sampling study costs approximately:

  • 10-15 hours of engineer for configuration and analysis
  • 5 minutes per observation ร— 400 observations = ~33 hours of recording
  • Total cost: ~$2,000-3,000 (at $50/hour)

If it avoids an unnecessary investment of $50,000, the ROI is 15:1.