Study Creation and Configuration
Step-by-step form with statistical parameters
Overview
The Study Creation module lets you configure all parameters needed to run a statistically valid work sampling study. The guided form ensures you don't forget any important data.
Form Fields
Basic Information
| Field | Description | Required |
|---|---|---|
| Study name | Unique identifier for the study (e.g., "Production Line A - Q1 2025") | โ Yes |
| Company | Client company or department name | โ No |
| Technician/Analyst | Name of the person responsible for the study | โ No |
| Department | Area or section where the study is performed | โ No |
| Objectives | Description of what is intended to be analyzed | โ No |
| Notes | Additional observations about the study | โ No |
Study Dates
- Start date: First day of observations
- End date: Last day of observations
The study duration directly affects the number of days available to distribute the required observations.
Statistical Parameters
๐ Key statistical concepts
- Confidence Level
- Probability that the results fall within the error margin. Options: 90%, 95% (recommended), 99%
- Error Margin (Precision)
- Maximum acceptable error in the results. Typically ยฑ5% for standard studies, ยฑ3% for high precision.
- Estimated Proportion (p)
- Initial estimate of the % of time spent on the main activity. Use 50% if you don't have prior data (maximizes the required sample size).
Automatic Sample Size Calculation
The application automatically calculates the number of required observations using the statistical formula:
n = (Zยฒ ร p ร (1-p)) / Eยฒ
Where: Z = Z-value for confidence level, p = estimated proportion, E = error margin
| Confidence Level | Error Margin | p = 50% | p = 30% |
|---|---|---|---|
| 90% | ยฑ5% | 271 obs. | 228 obs. |
| 95% | ยฑ5% | 385 obs. | 323 obs. |
| 95% | ยฑ3% | 1,068 obs. | 897 obs. |
| 99% | ยฑ5% | 666 obs. | 559 obs. |
Allowances Configuration
Allowances are additional percentages added to normal time to obtain standard time. They include:
- Personal needs (5%)
- Basic fatigue (4%)
- Variable fatigue (depending on conditions)
- Inevitable delays
Typical value: 15% for standard industrial work.
Pace Rating Scale
The application supports two performance rating scales:
100-133 Scale
ILO / Centesimal
- 100 = Normal pace
- 133 = Maximum incentive pace
60-80 Scale
Bedaux / BSI
- 60 = Normal pace
- 80 = Maximum incentive pace
Preliminary Observations
Optionally you can enter data from a previous pilot study:
- Number of preliminary observations: How many observations were made
- Observed % productive: Percentage of productive time found
This data helps refine the estimated proportion (p) and obtain a more precise final sample size calculation.
Editing Studies
Existing studies can be edited at any time. However, keep in mind:
- Changing dates may require regenerating the observation plan
- Modifying statistical parameters will affect the required number of observations
- Already collected data is not lost when editing
โ ๏ธ Important
Carefully review all parameters before starting to record observations. Although you can edit later, it's better to have the correct configuration from the start.